Small Case Version
The 008-120-11 series of alternators were designed for automatic duplex control of motors and other types of loads. They are available in a single phase voltage of 120 VAC. When power is applied to the alternator, the cross-wired DPDT output relay contacts change state each time the control voltage is disconnected. The "SP" Version has two options: (1) a lead/lag/automatic selector switch and (2) a push-to-test switch for added convenience in testing or trouble shooting.

Unit of Measure

Specifications

Options

N/A Lead/Lag Select Push-To-Test

Underwriter's Laboratories (UL) File Number

N/A #E101681

Product Type

N/A 1 Phase, Plug in Alternator

Alternating Current (AC) Operating Voltage

N/A 120 V

Power on Pins

N/A 3 6

Relay and Base Type

N/A DPDT, Cross Wired 8 Pin Octal Base

Base Configuration/Relay Type

N/A 8 Pin, DPDT Cross Wired

Alternating Current (AC) Supply Voltage

N/A 120 V

Supply Phase

N/A Single Phase

Supply Frequency

N/A 50/60 Hz

Output Current Rating

N/A 10 A

Power Dissipation

N/A < 1 Watt

Case Size

N/A Short

Operating Temperature

N/A -20 to +60 ºC

Storage Temperature

N/A -45 to 85 ºC

Enclosure Material

N/A Polycarbonate Plastic

Base Material

N/A Phenolic

Features

Features

N/A
  • Solid State Circuitry
  • Surge Protected
  • Replaces Mechanical Types
  • Plug In Base
  • Economical, Easy to Install
  • Lead/Lag/Auto Select Switch Option
  • Push-To-Test Switch Option

Installation Instruction

Installation Instruction

N/A

A single phase AC line and properly rated light bulbs are needed to test any alternator in the M.P.E. product line.

  1. The AC line and light bulbs must be connected to the alternator as shown in the test method diagram above.
  2. When the control switches are operated, the light bulbs will alternate on and off.

Test Method

Test Method

N/A

A single phase AC line and properly rated light bulbs are needed to test any alternator in the M.P.E. product line.

  1. The AC line and light bulbs must be connected to the alternator as shown in the test method diagram above.
  2. When the control switches are operated, the light bulbs will alternate on and off.